Build your machine downtime log.
Record machine stops, restarts and reviewed downtime reasons in one log.
How to build your machine downtime log
Describe the job
Record machine stops, restarts and reviewed downtime reasons in one log.
Review the first version
Choose how the production planner records the machine and how the engineering reviewer reviews the next step.
Refine the views
Ask First to adjust the fields and views for the people who will use the app.
Test before sharing
Walk through the process with a sample record and check who owns the next action.
A machine downtime log example
A restart time is earlier than the recorded stop.
Machine downtime log example
- Record
- Machine downtime log · 01
- Owner
- Production planner
Current stage · Production planner
Open the work record
A restart time is earlier than the recorded stop.
Read the full walkthrough
Open the work record
A restart time is earlier than the recorded stop.
- Record:
- Machine downtime log · 01
- Owner:
- Production planner
Review the required input
Flag the inconsistent timestamps and request correction before calculating a downtime total.
- Stage:
- Review pending
- Owner:
- Engineering reviewer
Record the next production action
Keep an unverified duration separate from the reported stop and restart times.
- Next action:
- Keep an unverified duration separate from the reported stop and restart times.
- Owner:
- Stores coordinator
What to include in your machine downtime log
Keep the machine in context
Keep machine, reported stop, reported restart, reason source, review owner and verified duration together so the next person can understand the request or record.
When the next step needs a decision
A restart time is earlier than the recorded stop. Flag the inconsistent timestamps and request correction before calculating a downtime total.
Keep verified duration visible
Keep an unverified duration separate from the reported stop and restart times.
Choose what each person needs
Give the production planner a working view and the engineering reviewer a review view. Keep machine and reported stop attached to the decision as the work moves between them.
Questions about machine downtime log
Start with machine, reported stop, reported restart, reason source, review owner and verified duration. Describe who enters the information and who reviews the next step.